Document library

On this page you can find all of the documents included in our development consent order (DCO) application in October 2025, along with the information published as part of our pre-application public consultations in 2023 and 2024. Any further document submissions made as part of the DCO process will be made available on the Planning Inspectorate’s website.

  • Project updates
  • DCO application (2025)
  • Statutory consultation materials (2024)
  • Preliminary environmental information report (2024)
  • Non-statutory consultation materials (2023)
Project updates
Programme document pdf 243 KB Download Eye
Newsletter (December 2025) pdf 17 MB Download Eye
Newsletter (September 2025) pdf 677 KB Download Eye
Newsletter (April 2025) pdf 1 MB Download Eye
Newsletter (July 2024) pdf 127 KB Download Eye
DCO application (2025)
1.1 Application Form P01.pdf pdf Download Eye
1.2 Cover Letter P01.pdf pdf Download Eye
1.3 Guide to the Application P01.pdf pdf Download Eye
1.4 s55 Checklist P01.pdf pdf Download Eye
1.5 Application Document Tracker P01.pdf pdf Download Eye
1.6 Programme Document P01.pdf pdf Download Eye
2.1 Location Order Limits and Grid Coordinate Plan P01.pdf pdf Download Eye
2.2 Land and Crown Land Plan P01.pdf pdf Download Eye
2.3 Works Plan P01.pdf pdf Download Eye
2.4 Street Works, Rights of Way and Access Plan P01.pdf pdf Download Eye
2.5 Traffic Regulation Measures Plan P01.pdf pdf Download Eye
2.6 Statutory and Non Statutory Sites or Features for Nature Conservation Plan P01.pdf pdf Download Eye
2.7 Water Bodies in a River Basin Management Plan P01.pdf pdf Download Eye
2.8 Statutory and Non Statutory Sites or Features of the Historic Environment Plan P01.pdf pdf Download Eye
2.9 Hedgerow Plan P01.pdf pdf Download Eye
3.1 Draft Development Consent Order P01.pdf pdf Download Eye
3.2 Explanatory Memorandum P01.pdf pdf Download Eye
3.3 SI Validation Report P01.pdf pdf Download Eye
4.1 Statement of Reasons P01.pdf pdf Download Eye
4.2 Funding Statement P01.pdf pdf Download Eye
4.3 Book of Reference P01.pdf pdf Download Eye
4.4 Land and Rights Negotiation Tracker P01.pdf pdf Download Eye
5.1 Consultation Report P01.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 1 of 7.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 2 of 7.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 3 of 7.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 4 of 7.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 5 of 7.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 6 of 7.pdf pdf Download Eye
5.2 Consultation Report Appendices P01 – Part 7 of 7.pdf pdf Download Eye
5.3 Planning Statement P01.pdf pdf Download Eye
5.4 Policy Compliance Document P01.pdf pdf Download Eye
5.5 Other Consents and Licences Statement P01.pdf pdf Download Eye
5.6 Design Approach Document P01.pdf pdf Download Eye
5.7 Information to Inform a Habitat Regulations Assessment P01.pdf pdf Download Eye
6.1 ES Table of Contents, Glossary and Acronyms P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 01 Introduction P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 02 The Scheme P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 03 Alternatives and Design Evolution P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 04 EIA Methodology P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 05 Landscape and Visual P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 06 Cultural Heritage and Archaeology P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 07 Ecology and Nature Conservation P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 08 Hydrology and Flood Risk P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 09 Traffic and Transport P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 10 Noise and Vibration P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 11 Air Quality P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 12 Ground Conditions P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 13 Land and Soils P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 14 Socio Economics, Land Use and Tourism P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 15 Climate Change P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 16 Other Environmental Topics P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 17 Cumulative and In Combination Effects P01.pdf pdf Download Eye
6.1 ES Vol 1 Chapter 18 Summary of Effects P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 02-1 Construction Phasing and Resource Schedule P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 02-2 Arboricultural Impact Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 02-3 Site Preparation Works P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 03-1 Site Identification Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 03-2 Land Identification Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 03-3 Land Identification Report – Addendum P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 03-4 Land Identification Report – Further Addendum P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 03-5 Review of National Policy Statement EN-3 P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 03-6 Grid Connection Corridor Appraisal P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 04-1 EIA Scoping Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 04-2 EIA Scoping Opinion P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 04-3 EIA Scoping Opinion Response Matrix P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 04-4 Long List of Other Development P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 04-5 Short List of Other Development P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-1 LVIA Assessment Methodology P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-2 ZTV and Photomontage Methodology P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-3 Effects on Landscape Character P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-4 Effects at Viewpoints P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-5 Effects on Visual Receptors P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-6 Glint and Glare Assessment P01 – Part 1 of 5.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-6 Glint and Glare Assessment P01 – Part 2 of 5.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-6 Glint and Glare Assessment P01 – Part 3 of 5.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-6 Glint and Glare Assessment P01 – Part 4 of 5.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-6 Glint and Glare Assessment P01 – Part 5 of 5.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 05-7 Residential Visual Amenity Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-1 Gazetteer of Heritage Assets P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-2 Desk Based Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-3 Photographic Record P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-4 Settings Impact Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-5 Archaeological Geophysical Survey Report P01 – Part 1 of 3.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-5 Archaeological Geophysical Survey Report P01 – Part 2 of 3.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-5 Archaeological Geophysical Survey Report P01 – Part 3 of 3.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-6 Site A Trial Trench Evaluation Interim Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-7 Site B Trial Trench Evaluation Interim Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-8 Site C Trial Trench Evaluation Final Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 06-9 Site D Trial Trench Evaluation Interim Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 07-1 Ecological Baseline Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 07-2 Breeding Bird Survey Report 2025 P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 07-3 Wintering Bird Survey Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 07-5 Great Crested Newt Presence or Absence Survey Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 07-6 Otter and Water Vole Survey Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 07-7 Bat Activity Survey Report P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 08-1 Flood Risk Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 08-2 WFD Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 08-3 Watercourse Crossing Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 09-1 Transport Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 09-2 Traffic Flow Diagrams P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 10-1 Noise and Vibration Terminology P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 10-2 Baseline Noise Survey P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 10-3 Construction Plant Data P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 10-4 Noise Contour Mapping – Operational Phase P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 10-5 Low Frequency Noise Analysis and Sample Plant Frequency Spectra P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 11-1 Air Quality Assessment Methodology P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 11-2 Baseline Air Quality Data P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 11-3 Construction Dust Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 11-4 Additional PM2.5 Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 12-1 Phase 1 Geo-Environmental Assessment P01 – Part 1 of 3.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 12-1 Phase 1 Geo-Environmental Assessment P01 – Part 2 of 3.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 12-1 Phase 1 Geo-Environmental Assessment P01 – Part 3 of 3.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 13-1 Agricultural Land Classification and Soil Resources P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 15-1 Greenhouse Gas Emissions Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 15-2 Climate Baseline P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 15-3 Climate Resilience Assessment P01.pdf pdf Download Eye
6.2 ES Vol 2 Appendix 15-4 In Combination Climate Change Impact Assessment P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 01 Introduction Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 03 Alternatives and Design Evolution Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 04 EIA Methodology Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 01 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 02 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 03 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 04 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 05 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 06 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 07 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 08 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 09 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 10 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 11 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 12 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 13 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 05 Landscape and Visual Figures P01 – Part 14 of 14.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 06 Cultural Heritage and Archaeology Figures P01 – Part 1 of 2.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 06 Cultural Heritage and Archaeology Figures P01 – Part 2 of 2.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 07 Ecology and Nature Conservation Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 08 Hydrology and Flood Risk Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 10 Noise and Vibration Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 11 Air Quality Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 13 Land and Soils Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Chapter 14 Socio Economics Land Use and Tourism Figures P01.pdf pdf Download Eye
6.3 ES Vol 3 Figure 2-1 Illustrative Environmental Masterplan P01.pdf pdf Download Eye
6.3 ES Vol 3 Figure 2-2 Indicative Engineering Drawings P01.pdf pdf Download Eye
6.3 ES Vol 3 Figure 2-3 Indicative Crossings Plan P01.pdf pdf Download Eye
6.3 ES Vol 3 Figure 2-4 Proposed Site Access P01.pdf pdf Download Eye
6.3 ES Vol 3 Figure 2-5 Indicative Construction Access and Compounds P01.pdf pdf Download Eye
6.3 ES Vol 3 Figure 2-6 Indicative Vegetation Clearance P01.pdf pdf Download Eye
6.4 ES Vol 4 Non Technical Summary P01.pdf pdf Download Eye
7.01 Design Parameters and Principles Statement P01.pdf pdf Download Eye
7.02 Commitments Register P01.pdf pdf Download Eye
7.03 Outline Construction Environmental Management Plan P01.pdf pdf Download Eye
7.04 Outline Construction Traffic Management Plan P01.pdf pdf Download Eye
7.05 Outline Operational Environmental Management Plan P01.pdf pdf Download Eye
7.06 Outline Decommissioning Environmental Management Plan P01.pdf pdf Download Eye
7.07 Outline Landscape and Ecological Management Plan P01.pdf pdf Download Eye
7.08 Outline Public Rights of Way Management Plan P01.pdf pdf Download Eye
7.09 Outline Soil Management Plan P01.pdf pdf Download Eye
7.10 Outline Battery Safety Management Plan P01.pdf pdf Download Eye
7.11 Outline Skills Supply Chain and Employment Plan P01.pdf pdf Download Eye
7.12 Outline Waste Management Plan P01.pdf pdf Download Eye
7.13 Outline Surface Water Management Plan P01.pdf pdf Download Eye
7.15 Outline Archaeological Mitigation Strategy P01.pdf pdf Download Eye
7.16 Outline Heritage Enhancement Strategy P01.pdf pdf Download Eye
7.17 Biodiversity Net Gain Report P01.pdf pdf Download Eye
7.18 Grid Connection Statement P01.pdf pdf Download Eye
7.19 Statutory Nuisance Statement P01.pdf pdf Download Eye
7.20 Potential Main Issues for Examination P01.pdf pdf Download Eye
Statutory consultation materials (2024)
Consultation brochure* pdf 7 MB Download Eye
Newsletter* pdf 1 MB Download Eye
Feedback form pdf 2 MB Download Eye
Exhibition boards pdf 4 MB Download Eye
Preliminary environmental information report – non-technical summary pdf 6 MB Download Eye
Non-statutory consultation report pdf 7 MB Download Eye
Statement of Community Consultation pdf 612 KB Download Eye
Section 47 notice pdf 92 KB Download Eye
Section 48 notice pdf 97 KB Download Eye
Preliminary environmental information report (2024)
EN010141 East Park PEIR Chapter 1 Introduction.pdf pdf Download Eye
PEIR Figure 1-1 Site Location Plan.pdf pdf Download Eye
PEIR Figure 1-2 Site References.pdf pdf Download Eye
PEIR Figure 1-3 Environmental Constraints.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 2-1 Indicative Construction Phasing and Resource Schedule.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 2-2 Outline Landscape and Ecological Management Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 2-3 Outline Construction Environmental Management Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 2-4 Outline Operational Environmental Management Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 2-5 Outline Decommissioning Environmental Management Plan.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 2 The Scheme.pdf pdf Download Eye
PEIR Figure 2-1 Indicative Work Plans.pdf pdf Download Eye
PEIR Figure 2-2 Illustrative Environmental Masterplan.pdf pdf Download Eye
PEIR Figure 2-3 Indicative Engineering Drawings.pdf pdf Download Eye
PEIR Figure 2-4 Indicative Crossing Plans.pdf pdf Download Eye
PEIR Figure 2-5 Proposed Site Access.pdf pdf Download Eye
PEIR Figure 2-6 Indicative Construction Access and Compounds.pdf pdf Download Eye
PEIR Figure 2-7 Indicative Vegetation Clearance.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 3-1 Site Identification Report.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 3-2 Land Identification Report.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 3-3 Land Identification Report – Addendum.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 3-4 Land Identification Report – Further Addendum.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 3-5 Review of National Policy Statement EN-3.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 3-6 Grid Connection Corridor Appraisal.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 3 Alternatives and Design Evolution.pdf pdf Download Eye
PEIR Figure 3-1 Scoping Indicative Zoning Plan.pdf pdf Download Eye
PEIR Figure 3-2 PEIR Indicative Zoning Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 4-1 EIA Scoping Opinion.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 4 Environmental Impact Assessment Methodology.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 5-1 Landscape and Visual Impact Assessment Methodology.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 5-2 ZTV and Photomontage Methodology.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 5-3 Effects on Landscape Character.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 5-4 Effects at Viewpoints.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 5-5 Effects on Visual Receptors.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 5-6 Glint and Glare Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 5 Landscape and Visual.pdf pdf Download Eye
PEIR Figure 5-01 Topography.pdf pdf Download Eye
PEIR Figure 5-02 Landscape Character Areas.pdf pdf Download Eye
PEIR Figure 5-03 – Zones of Theoretical Visibility.pdf pdf Download Eye
PEIR Figure 5-04 Viewpoint Locations and Visual Receptors.pdf pdf Download Eye
PEIR Figure 5-05 Viewpoint 1.pdf pdf Download Eye
PEIR Figure 5-06 Viewpoint 2.pdf pdf Download Eye
PEIR Figure 5-07 Viewpoint 3 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-08 Viewpoint 4.pdf pdf Download Eye
PEIR Figure 5-09 Viewpoint 5.pdf pdf Download Eye
PEIR Figure 5-10 Viewpoint 6.pdf pdf Download Eye
PEIR Figure 5-11 Viewpoint 7.pdf pdf Download Eye
PEIR Figure 5-12 Viewpoint 8.pdf pdf Download Eye
PEIR Figure 5-13 Viewpoint 9.pdf pdf Download Eye
PEIR Figure 5-14 Viewpoint 10.pdf pdf Download Eye
PEIR Figure 5-15 Viewpoint 11.pdf pdf Download Eye
PEIR Figure 5-16 Viewpoint 12.pdf pdf Download Eye
PEIR Figure 5-17 Viewpoint 13.pdf pdf Download Eye
PEIR Figure 5-18 Viewpoint 14.pdf pdf Download Eye
PEIR Figure 5-19 Viewpoint 15.pdf pdf Download Eye
PEIR Figure 5-20 Viewpoint 16.pdf pdf Download Eye
PEIR Figure 5-21 Viewpoint 17.pdf pdf Download Eye
PEIR Figure 5-22 Viewpoint 18.pdf pdf Download Eye
PEIR Figure 5-23 Viewpoint 19.pdf pdf Download Eye
PEIR Figure 5-24 Viewpoint 20.pdf pdf Download Eye
PEIR Figure 5-25 Viewpoint 21 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-26 Viewpoint 22.pdf pdf Download Eye
PEIR Figure 5-27 Viewpoint 23 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-28 Viewpoint 24.pdf pdf Download Eye
PEIR Figure 5-29 Viewpoint 25.pdf pdf Download Eye
PEIR Figure 5-30 Viewpoint 26.pdf pdf Download Eye
PEIR Figure 5-31 Viewpoint 27.pdf pdf Download Eye
PEIR Figure 5-32 Viewpoint 28.pdf pdf Download Eye
PEIR Figure 5-33 Viewpoint 29.pdf pdf Download Eye
PEIR Figure 5-34 Viewpoint 30.pdf pdf Download Eye
PEIR Figure 5-35 Viewpoint 31.pdf pdf Download Eye
PEIR Figure 5-36 Viewpoint 32.pdf pdf Download Eye
PEIR Figure 5-37 Viewpoint 33.pdf pdf Download Eye
PEIR Figure 5-38 Viewpoint 34.pdf pdf Download Eye
PEIR Figure 5-39 Viewpoint 35.pdf pdf Download Eye
PEIR Figure 5-40 Viewpoint 36 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-41 Viewpoint 37.pdf pdf Download Eye
PEIR Figure 5-42 Viewpoint 38.pdf pdf Download Eye
PEIR Figure 5-43 Viewpoint 39.pdf pdf Download Eye
PEIR Figure 5-44 Viewpoint 40.pdf pdf Download Eye
PEIR Figure 5-45 Viewpoint 41.pdf pdf Download Eye
PEIR Figure 5-46 Viewpoint 42 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-47 Viewpoint 43.pdf pdf Download Eye
PEIR Figure 5-48 Viewpoint 44.pdf pdf Download Eye
PEIR Figure 5-49 Viewpoint 45.pdf pdf Download Eye
PEIR Figure 5-50 Viewpoint 46.pdf pdf Download Eye
PEIR Figure 5-51 Viewpoint 47.pdf pdf Download Eye
PEIR Figure 5-52 Viewpoint 48.pdf pdf Download Eye
PEIR Figure 5-53 Viewpoint 49.pdf pdf Download Eye
PEIR Figure 5-54 Viewpoint 50.pdf pdf Download Eye
PEIR Figure 5-55 Viewpoint 51 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-56 Viewpoint 52.pdf pdf Download Eye
PEIR Figure 5-57 Viewpoint 53.pdf pdf Download Eye
PEIR Figure 5-58 Viewpoint 54.pdf pdf Download Eye
PEIR Figure 5-59 Viewpoint 55.pdf pdf Download Eye
PEIR Figure 5-60 Viewpoint 56.pdf pdf Download Eye
PEIR Figure 5-61 Viewpoint 57 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-62 Viewpoint 58.pdf pdf Download Eye
PEIR Figure 5-63 Viewpoint 59.pdf pdf Download Eye
PEIR Figure 5-64 Viewpoint 60.pdf pdf Download Eye
PEIR Figure 5-65 Viewpoint 61.pdf pdf Download Eye
PEIR Figure 5-66 Viewpoint 62 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-67 Viewpoint 63.pdf pdf Download Eye
PEIR Figure 5-68 Viewpoint 64.pdf pdf Download Eye
PEIR Figure 5-69 Viewpoint 65.pdf pdf Download Eye
PEIR Figure 5-70 Viewpoint 66.pdf pdf Download Eye
PEIR Figure 5-71 Viewpoint 67.pdf pdf Download Eye
PEIR Figure 5-72 Viewpoint 68 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-73 Viewpoint 69.pdf pdf Download Eye
PEIR Figure 5-74 Viewpoint 70.pdf pdf Download Eye
PEIR Figure 5-75 Viewpoint 71.pdf pdf Download Eye
PEIR Figure 5-76 Viewpoint 72.pdf pdf Download Eye
PEIR Figure 5-77 Viewpoint 73.pdf pdf Download Eye
PEIR Figure 5-78 Viewpoint 74.pdf pdf Download Eye
PEIR Figure 5-79 Viewpoint 75.pdf pdf Download Eye
PEIR Figure 5-80 Viewpoint 76 (includes Photomontage).pdf pdf Download Eye
PEIR Figure 5-81 Viewpoint 77.pdf pdf Download Eye
PEIR Figure 5-82 Viewpoint 78.pdf pdf Download Eye
PEIR Figure 5-83 Viewpoint 79.pdf pdf Download Eye
PEIR Figure 5-84 Viewpoint 80.pdf pdf Download Eye
PEIR Figure 5-85 Viewpoint 81.pdf pdf Download Eye
PEIR Figure 5-86 Viewpoint 82.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-1 Gazetteer of Heritage Assets and Events.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-2 Desk Based Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-3 Photographic Record.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-4 Settings Impact Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part1 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part2 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part3 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part4 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part5 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part6 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-5 Archaeological Geophysical Survey Report_Part7 of 7.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 6-6 Archaeological Targeted Trial Trench Evaluation.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 6 Cultural Heritage and Archaeology.pdf pdf Download Eye
PEIR Figure 6-1 Non Designated Assets within 1km Site A.pdf pdf Download Eye
PEIR Figure 6-10 Designated and Selected Non Designated Assets to north of Sites B C and D.pdf pdf Download Eye
PEIR Figure 6-11 Designated and Selected Non Designated Assets to south of Sites B C and D.pdf pdf Download Eye
PEIR Figure 6-12 Designated and Selected Non Designated Assets within 3km of Grid Connection (north).pdf pdf Download Eye
PEIR Figure 6-13 Designated and Selected Non Designated Assets within 3km of Grid Connection (south).pdf pdf Download Eye
PEIR Figure 6-14 Extract from a map by Saxton 1583.pdf pdf Download Eye
PEIR Figure 6-15 Extract from a map of Bedfordshire by Blaeu 1662.pdf pdf Download Eye
PEIR Figure 6-16 Extract from a map of Huntingdonshire by Blaeu 1662.pdf pdf Download Eye
PEIR Figure 6-17 Extract from a map of Bedford by Hyett 1817.pdf pdf Download Eye
PEIR Figure 6-18 Extract from a map of Wellingborough by Hyett 1817.pdf pdf Download Eye
PEIR Figure 6-19 Extract from a map of the Parish of Keysoe 1840.pdf pdf Download Eye
PEIR Figure 6-2 Non Designated Assets within 1km Site B.pdf pdf Download Eye
PEIR Figure 6-20 Site A overlain on extracts from OS maps dating 1883 to 1887.pdf pdf Download Eye
PEIR Figure 6-21 Site B overlain on extracts from OS maps dating 1883 to 1887.pdf pdf Download Eye
PEIR Figure 6-22 Site C overlain on extracts from OS maps dating 1883 to 1887.pdf pdf Download Eye
PEIR Figure 6-23 Site D overlain on extracts from OS maps dating 1883 to 1887.pdf pdf Download Eye
PEIR Figure 6-24 Grid Connection (north) overlain on extracts from OS maps dating 1883 to 1887.pdf pdf Download Eye
PEIR Figure 6-25 Grid Connection (south) overlain on extracts from OS maps dating 1883 to 1887.pdf pdf Download Eye
PEIR Figure 6-26 Site A overlain on extracts from OS maps dating 1958 to 1970.pdf pdf Download Eye
PEIR Figure 6-27 Site B overlain on extracts from OS maps dating 1958 to 1970.pdf pdf Download Eye
PEIR Figure 6-28 Site C overlain on extracts from OS maps dating 1958 to 1970.pdf pdf Download Eye
PEIR Figure 6-29 Site D overlain on extracts from OS maps dating 1958 to 1970.pdf pdf Download Eye
PEIR Figure 6-3 Non Designated Assets within 1km Sites C and D.pdf pdf Download Eye
PEIR Figure 6-30 Grid Connection (north) overlain on extracts from OS maps dating 1958 to 1970.pdf pdf Download Eye
PEIR Figure 6-31 Grid Connection (south) overlain on extracts from OS maps dating 1958 to 1970.pdf pdf Download Eye
PEIR Figure 6-32 Sites A and B overlain on processed LiDAR imagery.pdf pdf Download Eye
PEIR Figure 6-33 Sites C and D overlain on processed LiDAR imagery.pdf pdf Download Eye
PEIR Figure 6-34 Grid Connection overlain on processed LiDAR imagery.pdf pdf Download Eye
PEIR Figure 6-35 Field IDs within Sites A and B.pdf pdf Download Eye
PEIR Figure 6-36 Field IDs within Sites C and D.pdf pdf Download Eye
PEIR Figure 6-4 Non Designated Assets within 1km of Grid Connection (north).pdf pdf Download Eye
PEIR Figure 6-5 Non Designated Assets within 1km of Grid Connection (south).pdf pdf Download Eye
PEIR Figure 6-6 Previous Schemes of Investigation (Events) within 1km.pdf pdf Download Eye
PEIR Figure 6-7 Designated Heritage Assets within 3km with ZTVs.pdf pdf Download Eye
PEIR Figure 6-8 Designated and Selected Non Designated Assets to north of Sites A and B.pdf pdf Download Eye
PEIR Figure 6-9 Designated and Selected Non Designated Assets to south west of Sites A and B.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 7-1 Ecological Baseline Report.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 7-2 Breeding Bird Survey Report.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 7-3 Wintering Bird Survey Report.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 7-5 Great Crested Newt Presence or Absence Survey Report.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 7 Ecology and Nature Conservation.pdf pdf Download Eye
PEIR Figure 7-1 Statutory Designated Sites.pdf pdf Download Eye
PEIR Figure 7-2 Non-Statutory Designated Sites for Nature Conservation.pdf pdf Download Eye
PEIR Figure 7-3 Habitat Survey.pdf pdf Download Eye
PEIR Figure 7-4 Breeding Bird Survey.pdf pdf Download Eye
PEIR Figure 7-5 Wintering Bird Survey.pdf pdf Download Eye
PEIR Figure 7-6 Bat Surveys.pdf pdf Download Eye
PEIR Figure 7-7 Location of Ponds.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 8-1 Preliminary Flood Risk Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 8-2 Outline Surface Water Management Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 8-3 Preliminary WFD Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 8 Hydrology and Flood Risk.pdf pdf Download Eye
PEIR Figure 8-1 Watercourses.pdf pdf Download Eye
PEIR Figure 8-2 EA Fluvial Flood Map.pdf pdf Download Eye
PEIR Figure 8-3 0.1% AEP Modelled Flood Extent.pdf pdf Download Eye
PEIR Figure 8-4 EA Pluvial Flood Map.pdf pdf Download Eye
PEIR Figure 8-5 Bedrock Geology.pdf pdf Download Eye
PEIR Figure 8-6 Superficial Deposits.pdf pdf Download Eye
PEIR Figure 8-7 Topography and Watercourses.pdf pdf Download Eye
PEIR Figure 8-8 Designated Sites.pdf pdf Download Eye
PEIR Figure 8-9 Licenced Abstraction.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 9-1 Outline Construction Traffic Management Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 9-2 Traffic Flow Diagrams.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 9 Traffic and Transport.pdf pdf Download Eye
PEIR Figure 9-1 Public Rights of Way.pdf pdf Download Eye
PEIR Figure 9-2 ATC Location Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 10-1 Noise and Vibration Terminology.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 10-2 Baseline Noise Survey.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 10-3 Construction Plant Data.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 10-4 Noise Contour Mapping – Operational Phase.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 10 Noise and Vibration.pdf pdf Download Eye
PEIR Figure 10-1 Noise Monitoring Positions and Noise Sensitive Receptors.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 11-1 Air Quality Assessment Methodology.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 11-2 Baseline Air Quality Data.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 11-3 Construction Phase Dust Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 11 Air Quality.pdf pdf Download Eye
PEIR Figure 11-1 Construction Phase Dust Study Area.pdf pdf Download Eye
PEIR Figure 11-2 On-Road Vehicle Emissions Study Area.pdf pdf Download Eye
PEIR Figure 11-3 Construction Phase – Vehicle Emissions Screening Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 12-1 Phase 1 Geo-Environmental Report.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 12 Ground Conditions.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 13-1 Agricultural Land Classification and Soil Resources Survey.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 13 Land and Soils.pdf pdf Download Eye
PEIR Figure 13-1 Provisional ALC.pdf pdf Download Eye
PEIR Figure 13-2 ALC.pdf pdf Download Eye
PEIR Figure 13-3 District Level ALC.pdf pdf Download Eye
PEIR Figure 13-4 National Soil Map.pdf pdf Download Eye
PEIR Figure 13-5 Mineral Safeguarding Areas.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 14 Socio Economics, Land Use and Tourism.pdf pdf Download Eye
PEIR Figure 14-1 Study Area and Socio-Economic Receptors Plan.pdf pdf Download Eye
PEIR Figure 14-2 Isochrone Plan.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 15-1 GHG Emissions Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 15-2 Climate Baseline.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 15-3 Climate Resilience Assessment.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 15 Climate Change.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 16 Other Environmental Topics.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 17-1 Long List of Other Development.pdf pdf Download Eye
EN010141 East Park PEIR Appendix 17-2 Short List of Other Development.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 17 Cumulative and Intra Project Effects.pdf pdf Download Eye
PEIR Figure 17-1 Long List of Cumulative Schemes.pdf pdf Download Eye
EN010141 East Park PEIR Chapter 18 Summary of Effects.pdf pdf Download Eye
Non-statutory consultation materials (2023)
Newsletter pdf 4 MB Download Eye
Exhibition banners pdf 12 MB Download Eye
Draft masterplan pdf 8 MB Download Eye
Plans and drawings pdf 12 MB Download Eye

Get in touch

Call us on the community information line:
0808 258 5991

(Line open Monday to Friday, 9am to 5.30pm)

Write to us:
Freepost EAST PARK ENERGY

(Please note, no stamp or further address details are required)