
Document library
On this page you can find all of the documents included in our development consent order (DCO) application in October 2025, along with the information published as part of our pre-application public consultations in 2023 and 2024. Any further document submissions made as part of the DCO process will be made available on the Planning Inspectorate’s website.
Project updates
DCO application (2025)
Statutory consultation materials (2024)
Preliminary environmental information report (2024)
PEIR Figure 6-12 Designated and Selected Non Designated Assets within 3km of Grid Connection (north).pdf
pdf
PEIR Figure 6-13 Designated and Selected Non Designated Assets within 3km of Grid Connection (south).pdf
pdf
PEIR Figure 6-24 Grid Connection (north) overlain on extracts from OS maps dating 1883 to 1887.pdf
pdf
PEIR Figure 6-25 Grid Connection (south) overlain on extracts from OS maps dating 1883 to 1887.pdf
pdf
PEIR Figure 6-30 Grid Connection (north) overlain on extracts from OS maps dating 1958 to 1970.pdf
pdf
Get in touch
Call us on the community information line:
0808 258 5991
(Line open Monday to Friday, 9am to 5.30pm)
Email us:
info@eastparkenergy.co.uk
Write to us:
Freepost EAST PARK ENERGY
(Please note, no stamp or further address details are required)
